Provided By GlobeNewswire
Last update: Jun 16, 2025
MONTREAL, June 16, 2025 (GLOBE NEWSWIRE) -- Opus One Gold Corp (TSX-V: OOR) (the “Company” or “Opus One”) is pleased to announce that drill hole NO-25-14 from the winter drilling program on its 100% owned Noyell project near the town of Matagami, Abitibi, Québec, Canada, returned 8.96g/t Au over 5.2 m from 165 to 170.2 m. The mineralized interval represents a true width of approximately 4.2 m within the Zone 1 structure. This hole returned a second interval grading 2.91 g/t Au over 9.9 m (true width of 8 m) from 179.2 to 189.1 m. These intervals represent the core of the near surface high grade portion of Zone 1.
Read more at globenewswire.com