News Image

2025 Drilling Program Confirms Robust Mineralized Gold System Offering Significant Growth Potential at Martiniere

Provided By GlobeNewswire

Last update: Nov 17, 2025

TORONTO, Nov. 17, 2025 (GLOBE NEWSWIRE) -- Wallbridge Mining Company Limited (TSX: WM, OTCQB:WLBMF) (“Wallbridge” or the “Company”) is pleased to announce the final results from the remaining 13 holes of the second phase of its 2025 drilling program (“Phase 2”) at its 100% owned Martiniere gold project (“Martiniere”). These results reinforce the strong expansion potential of the Martiniere gold system, confirming the continuity of the Dragonfly shear corridor as laterally and vertically extensive system of sub-parallel, gold-bearing structures. Several of these structures host multiple high-grade gold intercepts, ranging from narrow, high-grade intervals to wider zones of mineralization up to more than five metres in down-hole length.

Read more at globenewswire.com
Follow ChartMill for more