Provided By GlobeNewswire
Last update: Aug 26, 2024
CALGARY, Alberta, Aug. 26, 2024 (GLOBE NEWSWIRE) -- Volt Lithium Corp. (TSXV: VLT | OTCQB: VLTLF I FSE: I2D) ("Volt" or the "Company") announces the successful deployment, installation and commenced function-testing of its first Field Unit located in the Permian Basin in Texas, paving the way for first lithium production. The Company is also pleased to announce that the Field Unit will be capable of processing over 200,0001 litres (1,250 barrels) of oilfield brine per day, representing a two-times scale-up from Volt’s previous processing capabilities of 96,0001 litres (600 barrels) per day, as announced in its July 17, 2024, press release.
Read more at globenewswire.com