News Image

Prosper Gold Extends Length of Gold-bearing System at Golden Corridor to 2.8 km, Intercepts Include 22.7 g/t Gold over 0.55 m – Golden Sidewalk Project, Red Lake, ON

Provided By Globe Newswire

Last update: Jan 17, 2022

VANCOUVER, British Columbia, Jan. 17, 2022 (GLOBE NEWSWIRE) -- Prosper Gold Corp. ("Prosper Gold" or the "Company") (TSXV:PGX) is pleased to report that it has now intersected gold mineralization along 2.8 kilometres of the Golden Corridor trend at the Golden Sidewalk Project Red Lake, Ontario. The Company has completed reconnaissance drilling totaling 21,103 metres in 66 diamond drill holes over 4.8 kilometres of the Golden Corridor (Figure 1). Drilling continues to outline a large hydrothermal system, intersecting ankerite ± biotite alteration with gold mineralization (Figure 2).

Read more at globenewswire.com
Follow ChartMill for more