Provided By GlobeNewswire
Last update: Jun 10, 2025
NOT FOR DISTRIBUTION TO U.S NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES
MONTREAL, June 10, 2025 (GLOBE NEWSWIRE) -- Opus One Gold Corp (TSX-V: OOR) (the “Company” or “Opus One”) is pleased to announce that drill hole NO-25-13 from the winter drilling program on its 100% owned Noyell project near the town of Matagami, Abitibi, Québec, Canada, returned 4.10g/t Au over 7.1 m from 572.8 to 579.9 m. The mineralized interval represents a true width of approximately 5.5 m within the Zone 1 structure.
Read more at globenewswire.com