Provided By GlobeNewswire
Last update: May 26, 2025
NOT FOR DISTRIBUTION TO U.S NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES
MONTREAL, May 26, 2025 (GLOBE NEWSWIRE) -- Opus One Gold Corp (TSX-V: OOR) (the “Company” or “Opus One”) is pleased to announce that drill hole NO-25-06 from the winter drilling program on its 100% owned Noyell project near the town of Matagami, Abitibi, Québec, Canada, returned 5.57g/t Au over 8.4 m from 232.2 to 240.6 m. The mineralized interval represents a true width of approximately 6.6 m within the Zone 1 structure.
Read more at globenewswire.com