Provided By GlobeNewswire
Last update: May 12, 2025
NOT FOR DISTRIBUTION TO U.S NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES
MONTREAL, May 12, 2025 (GLOBE NEWSWIRE) -- Opus One Gold Corp. (TSX-V: OOR) (the “Company” or “Opus One”) is pleased to announce that the first hole (NO-25-01) of the winter drilling program on its 100% owned Noyell project near the town of Matagami, Abitibi, Québec, returned 4.12 g/t Au over 7.3 m from 135.0 to 142.3 m. The mineralized interval represents a true width of approximately 6 m within the Zone 1 structure. This result includes a richer portion of 6.1 g/t Au over 4.0 m. A second interval, representing Zone 2, returned 4.71 g/t Au over 0.5 m from 206.5 to 207.0 m.
Read more at globenewswire.com