News Image

LIFT intersects 16 m at 1.26% Li2O at its Echo pegmatite, Yellowknife Lithium Project, NWT

Provided By GlobeNewswire

Last update: Mar 13, 2024

VANCOUVER, British Columbia, March 13, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 8 drill holes completed at the Echo, Fi Main, Fi Southwest, & Fi Boye pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling intersected significant intervals of spodumene mineralization, with the following highlights:   

Read more at globenewswire.com
Follow ChartMill for more