News Image

Fury Commences 2025 Drilling Program at the Éléonore South Gold Project

Provided By GlobeNewswire

Last update: Feb 3, 2025

TORONTO, Feb. 03, 2025 (GLOBE NEWSWIRE) -- Fury Gold Mines Limited (TSX and NYSE American: FURY) (“Fury” or the “Company”) announces that a drill has been mobilized to the greenfield exploration Éléonore South gold project located in the Eeyou Istchee Territory in the James Bay region of Northern Quebec (Figure 1). Drilling will target robust multi-faceted geological, geophysical, and geochemical gold anomalies within the same sedimentary rock package that hosts the Éléonore Mine. The fully funded first phase drilling campaign will comprise approximately 4,000 – 6,000 metres (m) targeting an interpreted fold nose within the Low Formation sediments. Within the prospective folded stratigraphy are six undrilled priority targets spanning over 3 kilometres (km) of strike length that have been identified through a combination of biogeochemical sampling and interpretation of magnetics and electromagnetics survey data (Figure 2)(see news release dated November 12, 2024).

Read more at globenewswire.com
Follow ChartMill for more