Provided By GlobeNewswire
Last update: Jul 26, 2023
Results Highlights:
VANCOUVER, British Columbia, July 26, 2023 (GLOBE NEWSWIRE) -- Deep-South Resources Inc. ("Deep-South" or “the Company") (TSX-V: DSM) announces the third batch of assay results from its drilling program interrupted in June 2021 at its Haib Copper project in southern Namibia. The program was interrupted when the Ministry of Mines and Energy of Namibia had denied the renewal of the Haib Copper licence EPL 3140. Results from 12 drill holes have been received after the renewal denial of the licence. As the license has been renewed on July 2023, we can now disclose the results. We have completed our QA / QC on the first 6 drill holes. The QA \ QC on the remaining results is underway and they will be disclosed within 7 day. A total of 22 holes were drilled and 19 were sent for assaying. The remaining 3 samples will be prepared and eventually sent for assaying.
Read more at globenewswire.com