VANCOUVER, British Columbia, Jan. 22, 2026 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (“Imperial” or the “Company”) (TSX:III) reports on the first diamond drill hole from the Mount Polley 2025 Phase 2 Diamond Drill Program which includes 11.0 metres with a grade of 4.43% copper, 1.53 g/t gold and 41.7 g/t silver. The nine hole Phase 2 program consisted of 3,718.3 metres.
Read more at globenewswire.comDrilling at Mount Polley Intersects 11.0 Metres Grading 4.43% Copper, 1.53 g/t Gold and 41.7 g/t Silver
Provided By GlobeNewswire – Last update: